The following fixes have been made:
-
The pressure release capacity of the emergency valves was adjusted.
-
The drain capacity of the steam generator valves was ajusted.
-
Labels were added with the closing direction of the valves.
-
Added experimental gauge animation option.
-
Made corrections to reactor core calculations when there is a dangerous combination of water and steam.
-
Fixed bug where the location of the Condenser Charge Pumps and Outer Reactor Vessel could not be assigned.
-
Added a new animation to AO to indicate that he is busy doing some work.
-
Fixed the visual error of the main valve panel, where the condenser was not visible correctly.
-
Adjustments were made to the way of getting available system resolutions.
-
Fixed the bug in the animation of the short circuits when restoring a saved progress.
Changed files in this update